Previous Responsibilities
- SitRep 2
- Produce a report comparing the various COTS (e.g., StratoLogger, G-Wiz, Raven, Parrot, Eggtimer, AIM, EasyMini, TeleMetrum, RRC3, etc.).
- Produce a specification of the selected preferred COTS system so we can start by implementing it on our own TRS and have a testing platform
Current Responsibilities
- Generalise the dashboard system of our department to the whole Porto Space Team;
- Acquire an EggTimer, prepare configuration files and elaborate a field-use report.
Relevant Education background
- LEEC Year X completed.
About
TODO